This section contains information about the machine features and guides for operation, which includes our quick start checklist before a print can be started.
Refer to Machine Identification for information on how to identify your machine model.
Operation | AON M2+ (CE) | AON M2+ (R‑NZ) | AON M2+ | AON‑M2 2020 | AON‑M2 |
---|---|---|---|---|---|
Quick Start (Klipper) | • | • | • | ||
Quick Start (Marlin) | • | • | • | • | • |
Replace Filament | • | • | • | • | • |
Install Build Plates | • | • | |||
Install Build Sheet | • | • | • | ||
Vacuum Bed Feature | • | • | • | ||
Preheat Build Chamber Components | • | • | • | • | • |
Automatic Bed Leveling (ABL) Feature | • | • | • | • | • |
First Layer Guide | • | • | • | • | • |
Filament Runout Detection (FRD) Feature | • | • | • | • | • |
Filament Change for Filament Runout Detection (FRD) Feature | • | • | • | • | • |
Pause and Resume Feature | • | • | • | • | • |